Quote:
Originally Posted by Big Chad
Yeah once that wood gets burning it pretty much over with. That was a shitty day. That bearing just cost that freight company ALOT of money. Take out the rebuilding of the bridge cost, just the lack of trains moving.. WOW
|
Mainline track man, the money lost off trains not moving was an easy 10x larger than the cost of that bridge. Even with the cost of an emergency rush on the building of it.